Works at or near a Level Crossings may impact upon one or more of the following:
- Safety of road users, railway passengers and personnel
- Train operations
- Structural integrity of the permanent way and other railway structures
- Underground apparatus serving the railway (including signalling & telecoms)
This shall be considered at all works at a level crossing, within 200m of a level crossing or with the potential to cause ‘blocking back’ over the level crossing. Translink Third Party Works Engineer can assist in managing these risks and shall be notified where the above applies to your proposals.
Notification of Proposed Works
Translink shall be notified of proposed works near a Level Crossing at least 1 month in advance (greater where possible for major projects or those subject to CDM regulations) by sending the following to Translink Third Party Works team at thirdpartyworks@translink.co.uk
- Download Level Crossing Form - Word (325KB)
- Location & Site plan, Temporary Traffic Management Plan & Diversion Plan.
- Details of proposed method of works and temporary traffic management proposals to mitigate risk to the Level Crossing: RAMS